400A service upgrade with 200A sub-panel on Olney Ave, Phoenix

A property that had outgrown its service. We installed a new 400A meter-main with an exterior emergency disconnect, trenched and installed a new underground feeder, and set a 200A sub-panel to serve the added load — all permitted, inspected, and backfilled clean.

AZ ROC 361086 ✓$1M/$2M insured & bonded 40+ years combined experienceFree estimates Permits & inspections handledClean job sites

Get a free quote

Tell us what you need. We answer fast — usually the same day.

By submitting, you agree to be contacted by B and D Electric LLC by phone or text about your request. We don't share your information. Message rates may apply.

★ 5.0 from 31 Google reviews✓ Same-day emergency calls✓ Free written estimates ✓ Work done right the first time✓ Open Mon–Sun, 24/7

The job

What we found and what we did

This property had outgrown its service, and the new load needed real headroom, not a patch.

We installed a new 400A meter-main with an exterior emergency disconnect, trenched and installed a new underground feeder, and set a 200A sub-panel to serve the added load. Everything was permitted and inspected, the utility set and released the meter, and the trench was backfilled clean.

  • New 400A meter-main service
  • Trenched and inspected underground feeder
  • New 200A sub-panel for added load
  • Permitted, inspected, site restored

More work near here: electricians in Phoenix and panel upgrades.

Job facts

Job 400A service upgrade
Location Olney Ave, Phoenix
Service New 400A meter-main with emergency disconnect
Feeder New underground feeder, trenched to depth
Sub-panel 200A for the added load
Permit Inspected, site backfilled
Get a free estimate

Photos

On the job

All photos are our own, taken on this job.

The finished 400A service equipment outside, meter set and released by the utility.ENERGIZED
The finished 400A service equipment outside, meter set and released by the utility.
New 400A meter-main with emergency service disconnect.AFTER
New 400A meter-main with emergency service disconnect.
The new 200A sub-panel being wired — dead front off, breakers and feeder terminations in.SUB-PANEL
The new 200A sub-panel being wired — dead front off, breakers and feeder terminations in.
Trenching the new underground feeder run to depth.IN PROGRESS
Trenching the new underground feeder run to depth.