Licensed & insured Phoenix electrical contractor  ·  Arizona ROC 361086 24/7 emergency service  ·  (480) 828-1181
Home › 400A Service Upgrades

Phoenix, Arizona

200 to 400 Amp Service Upgrades in Phoenix

When a house has outgrown 200 amps, a 400A service is a bigger project than a panel swap: larger equipment, often engineered plans, and more utility review. We handle all of it.

AZ ROC 361086 ✓$1M/$2M insured & bonded 40+ years combined experienceFree estimates Permits & inspections handledClean job sites

Get a free quote

Tell us what you need. We answer fast — usually the same day.

By submitting, you agree to be contacted by B and D Electric LLC by phone or text about your request. We don't share your information. Message rates may apply.

★ 5.0 from 31 Google reviews✓ Same-day emergency calls✓ Free written estimates ✓ Work done right the first time✓ Open Mon–Sun, 24/7

Overview

What this covers

Most Phoenix homes are fine on 200 amps. A 400A service makes sense when the load calculation says the house has truly outgrown it: several A/C systems, a pool and spa, a casita, more than one EV, or a switch to all-electric appliances.

We do the load calculation before recommending anything. Sometimes a sub-panel or EV load management solves it for much less, and we'll tell you when that's the case.

Get a free quote
  • 200A to 400A residential service upgrades
  • New 400A meter-main with exterior emergency disconnect
  • Sub-panels for pools, casitas, shops and garages
  • New underground or overhead service conductors
  • SRP shop drawings and APS inspections handled
  • Load calculation first, so you only upgrade if you need it

What drives the need

  • A/C. The biggest load in any Valley home, running for hours in summer. Two or three systems adds up fast.
  • EV chargers. A Level 2 charger is typically a 40 to 60 amp circuit. Two cars doubles it.
  • Pool and spa. Pumps, heaters, lighting and water features.
  • A casita, guest house or shop with its own A/C and kitchen.
  • Going all-electric: range, dryer, water heater, or a heat pump replacing gas.

SRP: shop drawings for 400A

SRP requires shop drawings for every service rated 400A and above, and for 320A equipment that isn't on its pre-approved list. A residential “400A” service usually uses a meter rated 320A continuous (the CL320 class). We prepare and submit the drawings, and SRP has to approve the meter location before the work.

APS: its own inspection

When a job replaces or relocates the meter, APS requires its own inspection and approval before it re-energizes the service, on top of the city inspection. We file the request with load information, schedule the disconnect, and coordinate both inspections. How the SRP and APS process works →

A real 400A job: Olney Ave

On Olney Ave in Phoenix the property had outgrown its service. We installed a new 400A meter-main with an exterior emergency disconnect, trenched and installed a new underground feeder, and set a 200A sub-panel for the added load. It was permitted and inspected, the utility set and released the meter, and the trench was backfilled clean. See the full Olney Ave job →

Before you decide

Read 200A vs. 400A: do you need a bigger service? and what a panel or service upgrade costs in Phoenix. Or call us and we'll run the load calculation for your house.

Recent work

400A Service Upgrades we've completed in Phoenix

Our own photos, our own jobs.

400A service upgrade with 200A sub-panel — Olney Ave, Phoenix

A property that had outgrown its service. We installed a new 400A meter-main with an exterior emergency disconnect, trenched and installed a new underground feeder, and set a 200A sub-panel to serve the added load — all permitted, inspected, and backfilled clean.

The finished 400A service equipment outside, meter set and released by the utility. ENERGIZED
The finished 400A service equipment outside, meter set and released by the utility.
New 400A meter-main with emergency service disconnect. AFTER
New 400A meter-main with emergency service disconnect.
The new 200A sub-panel being wired — dead front off, breakers and feeder terminations in. SUB-PANEL
The new 200A sub-panel being wired — dead front off, breakers and feeder terminations in.
Trenching the new underground feeder run to depth. IN PROGRESS
Trenching the new underground feeder run to depth.
  • New 400A meter-main service
  • Trenched and inspected underground feeder
  • New 200A sub-panel for added load
  • Permitted, inspected, site restored

See the full job →

Before you hire anyone

Panel and service upgrade guides

Straight answers on cost, sizing, the utility process and obsolete panels.

Also from us

Other services

FAQ

400A Service Upgrades — questions we get

Do I need 400 amps for an EV charger?

Usually not. Most homes can add one Level 2 charger on a 200A service. The load calculation tells you for sure.

Does a 400A upgrade need engineered plans?

Often, yes. SRP requires shop drawings for services 400A and above. We handle both.

Is a 400 amp service really 400 amps?

Residential 400A services usually use a meter rated 320A continuous (CL320). It's the standard way utilities meter large homes.

How long does a 400A upgrade take?

The work itself is usually a short window with the power off. The longer part is utility review and scheduling, so we file early and give you a date once the utility confirms it.

Are you licensed and insured?

Yes. B and D Electric holds Arizona ROC license 361086, carries $1M/$2M general liability insurance, and is bonded through RLI Surety. We'll email you the certificate of insurance on request.

Do you charge for estimates?

No. Estimates are free and given in writing after we've actually looked at the job.

How fast can you get out here?

Same-day for emergencies in most of the Valley, and usually within a couple of days for scheduled work. Call and we'll tell you honestly.

Need 400a service upgrades in Phoenix?

Tell us what's going on and we'll give you a straight answer and a free written estimate. No pressure, no upsell.

Call (480) 828-1181 Text us Free quote